Last summer there was a bit of a hoo-hah when it emerged that the new trains that Koleje Mazowieckie had bought (with EU regional funds) could not actually be used to serve the line to Góra Kalwaria because the platform there, and at the intermediary station stop, Czachówek Wschodni, were too low.
The platforms, at the same level as the railhead, made it impossible for those with impaired mobility to get on or off the new-generation trains, FLIRTs, Impluses or Elfs (even though Elf = Electric Low Floor). A hurried solution was suggested - running new trains on to Czachówek Południowy, and from there a shuttle service using the old rolling stock (modernised EN57s) to Góra Kalwaria. After interventions from local politicians, PKP PLK came up with a better solution - raise the platforms at the two stations. Not for the full length, only enough for a four-car unit.
Work was completed in March, and now the new rolling stock serves passengers all the way through from Góra Kalwaria direct to Warsaw and back.
I went to revisit Czachówek Wschodni. [Last summer's trip related here.] One thing struck me - the work was done on a budget - raise the platform level from 30cm to 55cm and do not do one hand's turn more than that. The old paving slabs were re-used (good!) and new platform edges built up to the statutory level. No new signage (about more anon).
Below: approaching the island platform from the north. Note the yellow barrier; to the right, the old platform level, closed off to passengers. To the left, a ramp sloping gently up to the height of the new platform.
Below: seen from the southern side of the tracks, a Warsaw-bound FLIRT unit pulls away from Czachówek Wschodni station. From this side, there is no signage whatsoever referring to the station, even the 'do not cross the tracks/no trespassing' signs that were once here have been removed. It may be that some day a Park+Ride will be established here, tempting local commuters to take the train to Piaseczno and Warsaw. One thing is more likely, the entire Skierniewice-Łuków line is up for modernisation, which is why the bare minimum has been spent on the two passenger stations along its length.
Below: a curious Marian shrine in the village of Czarny Las, in the form of a cylindrical pillar. Looks more like a Napoleonic war memorial than what one expects from local devotions.

Below: (bonus shot) the old bridge over the river Czarna, between Czachówek Południowy and Sułkowice, has been demolished and a new one is being built, and, I presume, new asphalt will be laid on either side of the bridge improving local road infrastructure around here, allowing mud-free access to the village of Ławki from Sułkowice at last. [See here how it looked a few months ago.]
This time three years ago:
Covid and economy recovery
Electric cars for hire by the minute
(but a memory now!)
Mszczonów - another railway junction
This time 11 years ago:
The Devil is in Doubt - short story, part I
This time 12 years ago:
Stormclouds are raging all around my door
This time 13 years ago:
Floods endanger Warsaw
This time 14 years ago:
Coal line rarity

















































