Monday, 11 February 2019

The Filth and the Fury

I AM UTTERLY FED UP OF HAVING TO TRAIPSE THROUGH LAKES OF SLUDGE TO GET TO THE STATION EACH MORNING BECAUSE THE USELESS BUILDERS WHO'VE SPENT THE LAST TWO AND HALF YEARS PUTTING UP A VIADUCT TO CARRY A LOCAL ROAD OVER THE RAILWAY ARE TOO BLOODY INCONSIDERATE TO SECURE DECENT FOOTPATHS FOR LOCAL RESIDENTS.

I AM UTTERLY FED UP WITH CONSTANTLY CLEANING SHOES. WITH BRINGING FILTH ONTO THE OFFICE CARPETS. WITH HAVING TO APOLOGISE FOR THE TOTAL INADEQUACY OF THESE HOPELESS BUILDERS WHO ARE A YEAR-AND-HALF BEHIND SCHEDULE.

LOOK AT THIS. LOOK AT IT AND ASK YOURSELVES HOW ANYONE CAN WADE THROUGH THIS SHIT AND KEEP SOME KIND OF CLEANLINESS OF FOOTWEAR OR TROUSERS.

I WANT THE NAME OF THE PERSON RESPONSIBLE FOR THIS SHIT.




No, I'm not alone in complaining. Mieszkańcy Osiedla Etap have had a TVN news crew round; Halo Ursynów has written about this, the situation persists.

I HAVE HAD ENOUGH OF THIS!!!




This time three years ago:
Defining the human experience

This time five years ago:
The City of Warsaw wants you to complain

This time six years ago:
Czachówek's wild woods in winter

This time seven years ago:
Vistula freezes over downstream of Warsaw 

This time eight years ago:
Twilight of the Ikars

This time nine year ago:
Polish TV adverts for parapharmaceuticals

This time tn years ago:
Jeziorki wetlands in winter

This time 11 years ago:
A week into Lent

Sunday, 21 August 2016

That's it - Karczunkowska's closed.

As promised, I was there with my camera to capture for local posterity the moment the last train passed the level crossing at W-wa Jeziorki. At two minutes past midnight, running nine minutes late, the train from Radom to W-wa Wschodnia crossed ul. Karczunkowska...


...and for the very last time the barriers were raised to let a vehicle through, a van carrying the barriers that would be erected to close the roads off to traffic. More on this in a moment.


I had a chat with the level crossing keeper, who said that the hut would still be manned until Monday, with the barriers permanently lowered. On Monday, a team from PKP PLK, the rail infrastructure operator, will come and remove all the viable equipment (some of which can be seen in the two shots below taken from both side windows).


The shots have the flavour of an O. Winston Link photo - all that's missing is a Norfork & Western freight train hauled by a massive steam engine hammering through. By Monday, all that will be left here will be an empty shell, to be demolished as it stands directly in the path of the viaduct.


I met Dr Marcin, who was distressed that ul. Buszycka and ul. Nawłocka had both been completely closed off by the road-builders' barriers. Now, given that ul. Buszycka is a cul-de-sac, this would have meant its inhabitants would have had their cars stranded. Below: the barriers in place. To get your car into ul. Buszycka would have meant dismantling this barrier as well as the one at the entrance to Buszycka itself (next turning on the right). A number of local residents were none too happy with this arrangement.


By the cold light of day, however, common sense had prevailed; the barriers at the mouths of ul. Buszycka and Nawłocka had been completely taken down and left to lie by the side of the road. The barrier across Karczunkowska had been partially dismantled, allowing access to Buszycka. If you click to enlarge this photo, you will see the level crossing barriers are down; they will remain down until finally removed. You can also make out on the right the path the new pavement will take - from ul. Nawłocka all the way to the station, all 380m of it. Progress!


Below: the temporary bus loop off the access road to Biedronka. The 209 is waiting to depart. Biedronka will suffer a massive drop in turnover, as few shoppers from Zgorzała, Zamienie and Dawidy Bankowe will do the 10km detour to come here. Commuters passing through will shop elsewhere on their diverted drive home,


While Jeziorki will lose the 715 and 319 buses, the number of 209s running in rush hours will rise from two to three and there will also be two L39s an hour throughout the day, although they will turn south onto ul. Puławska, requiring a clumsy change to catch a bus towards town.


The biggest question is: how long before the viaduct is completed and open? As I wrote, it took three years and two months to complete the viaduct carrying ul. Poloneza over the S2 expressway. But this is a more important road. Word from Ursynów town hall is that ul. Karczunkowska will reopen on 24 December ["W związku z przebudową trakcji na skrzyżowaniu z ul. Karczunkowską przejazd zostanie zamknięty od godziny 20.00 w dniu  20 sierpnia br. do dnia 24 grudnia br."] No mention in that sentence of the viaduct being opened - just that the overhead power lines will be in place by Christmas.

As usual with road closures, there are two types. Both are advertised with adequate signage. One type is hermetic - like on Baletowa or Krasickiego. You will not pass. Turn your car around and go back. The detour may be 10km long. But you cannot avoid it. The other type looks like the first - except you can drive right through, unhindered, slowing down for a bit of rough road surface. Because you can't tell until you get right up to the closure, there were many motorists driving up ul. Karczunkowska (2km ) to see there's no way across, then driving back (2km).

This time last year:
What happened to Poland's Amish?

This time two years ago:
PKP publishes plans for upgrade of Warsaw-Radom line

This time three years ago:
World's largest ship calls in at Gdańsk

This time five years ago:
Raymond's Treasure - a short story

This time six years ago:
Now an urban legend: Kebab factory under W-wa Centralna

This time seven years ago:
It was twenty years ago today

This time nine years ago:
By bike to Czachówek again

Saturday, 13 February 2010

Oligocene water, Jeziorki

I'm surprised that I've not written about this before. Warsaw sits on top of reserves of water trapped 200m below the ground in rocks laid down in the Oligocene period. The city has 107 of these artesian wells (click for full list of addresses and opening times). Above: here is our local one on ul. Buszycka, close to W-wa Jeziorki station.

Drawing spring water from here is free (as opposed to the shop-bought stuff that typically costs around 1 zł 50 for a litre and half bottle). You can often see people dragging large cannisters to them for a free fill-up with drinkable water.

The woda oligoceńska comes out of taps at a fierce pressure, enough to fill a five-litre container (right) in a few seconds.

Access to free spring water is a wonderful institution; while our tapwater is chlorinated and of dubious potability, the water filtered through rocks from the Oligocene 25 million years old, is made out of 13.7 billion year-old hydrogen atoms and slightly younger oxygen atoms, mixed to a precise ratio of two to one, pure and eminently drinkable.

A propos of water, an interesting article from this week's New Scientist. Why does water freeze from the top down when every other liquid freezes from the bottom up?